Reuse & Permissions

It is not necessary to obtain permission to reuse this article or its components as it is available under the terms of the Creative Commons Attribution 4.0 International license. This license permits unrestricted use, distribution, and reproduction in any medium, provided attribution to the author(s) and the published article's title, journal citation, and DOI are maintained. Please note that some figures may have been included with permission from other third parties. It is your responsibility to obtain the proper permission from the rights holder directly for these figures.

Export citation

Export citation

Choose format for download:

Download Citation
  • Open Access

Optimized bunch lengthening for beam extraction from J-PARC RCS

Phys. Rev. Accel. Beams 29, 113502 – Published 10 November, 2026

DOI: https://doi.org/10.1103/vk96-lb5v

Abstract

The 3-GeV rapid-cycling synchrotron (RCS) at Japan Proton Accelerator Research Complex (J-PARC) supplies a high-intensity beam to the Main Ring (MR) synchrotron. Under the present operating conditions, the RCS extraction bunch is intentionally injected into the MR rf bucket in a mismatched condition. This mismatch causes the bunch to dilute within the MR bucket, which rapidly increases the bunching factor Bf, defined as the ratio of average to peak current, and raises it to the desired value immediately after injection. Increasing the bunching factor Bf is essential for reducing beam losses caused by space-charge effects. Although this scheme has been effective for improving Bf, the dilution process also produces oscillations in the bunch profile and leads to local reductions of Bf, which contribute to beam losses immediately after MR injection. To achieve higher beam power in future MR operation, it is therefore desirable to increase Bf before injection into MR, so that beam losses at the beginning of acceleration can be suppressed. A method called “bunch lengthening” has been proposed to stretch the RCS extraction beam bunch. This method stretches the bunch and increases the Bf. It is based on driving a second-harmonic rf voltage in the latter part of acceleration and placing the beam at the unstable fixed point. Experiments on bunch lengthening with low-intensity beams, conducted in RCS and MR, demonstrated the stretching of the RCS extraction beam. The Bf increased from approximately 0.2 to 0.4 in both simulations and beam experiments. These results indicate that the longitudinal beam matching between RCS and MR has improved. To further optimize bunch lengthening, the deformation process of the stretched bunch was investigated. The second-harmonic rf voltage was applied twice with optimized timing, resulting in improved longitudinal matching. A detailed presentation of the bunch lengthening and the results of demonstration tests conducted on the J-PARC synchrotrons is provided. The examination results on the optimization of bunch lengthening are also reported.

View figure in article

Physics Subject Headings (PhySH)

Article Text

References (18)

  1. H. Hotchi et al., Beam commissioning of the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex, Phys. Rev. ST Accel. Beams 12, 040402 (2009).
  2. K. Yamamoto et al., Design and actual performance of J-PARC 3-GeV rapid cycling synchrotron for high-intensity operation, J. Nucl. Sci. Technol. 59, 1174 (2022).
  3. T. Koseki et al., Beam commissioning and operation of the J-PARC main ring synchrotron, Prog. Theor. Exp. Phys. 2012, 02B004 (2012).
  4. S. Igarashi et al., Accelerator design for 1.3-MW beam power operation of the J-PARC Main Ring, Prog. Theor. Exp. Phys. 2021, 033G01 (2021).
  5. H. Klingbeil, U. Laier, and D. Lens, Theoretical Foundations of Synchrotron and Storage Ring RF Systems (Springer, New York, 2015).
  6. T. Yasui et al., Transverse emittance growth caused by space-charge-induced resonance, Phys. Rev. Accel. Beams 23, 061001 (2020).
  7. H. Hotchi, Beyond 1-MW beam operation of J-PARC Main Ring, J. Phys. Soc. Jpn. Conf. Proc. 45, 011115 (2026).
  8. J. Griffin et al., Time and momentum exchange for production and collection of intense antiproton beams at Fermilab, IEEE Trans. Nucl. Sci. 30, 2630 (1983).
  9. R. Garoby, A non-adiabatic procedure in the PS to supply the nominal proton bunches for LHC into 200 MHz RF buckets in SPS, Tech. Rep., PS/RF/Note 93-17, CERN, 1993.
  10. R. Garoby, Rf gymnastics in synchrotrons, CERN Yellow Report CERN-2011-007, CERN, Geneva, Switzerland, 2011, pp. 431–446.
  11. H. Okita et al., Consideration for improving the longitudinal beam matching between RCS and MR at the J-PARC, J. Phys.: Conf. Ser. 3094, 012027 (2025).
  12. C. Ohmori et al., Development of a high gradient rf system using a nanocrystalline soft magnetic alloy, Phys. Rev. ST Accel. Beams 16, 112002 (2013).
  13. F. Tamura et al., Commissioning of the next-generation LLRF control system for the Rapid Cycling Synchrotron of the Japan Proton Accelerator Research Complex, Nucl. Instrum. Methods Phys. Res. A 999, 165211 (2021).
  14. F. Tamura et al., Multiharmonic vector rf voltage control for wideband cavities driven by vacuum tube amplifiers in a rapid cycling synchrotron, Phys. Rev. Accel. Beams 22, 092001 (2019).
  15. H. Timko et al., Beam longitudinal dynamics simulation studies, Phys. Rev. ST Accel. Beams 26, 114602 (2023).
  16. https://docs.scipy.org/doc/scipy/reference/generated/scipy.optimize.least_squares.html.
  17. H. Okita et al., Improvement of the longitudinal phase space tomography at the J-PARC synchrotrons, J. Phys.: Conf. Ser. 2687, 072005 (2024).
  18. T. F. Coleman and Y. Li, An interior trust region approach for nonlinear minimization subject to bounds, Tech. Rep., TR 93-1342, Cornell University, 1993.

Outline

Information

Sign In to Your Journals Account

Filter

Filter

Article Lookup

Enter a citation